Factory Floor

Performance Improvement


Reduced Cycle Time by 7%

Engine Assembly Line

Case Drilldown

Linecraft correctly identified a semi-automated torquing station as a bottleneck for the existing throughput. Its cycle data analysis showed that the automatic part of the cycle is consistent every time, but there’s a high variability in the time for manual work content.

Automatic work content is consistent compared to manual work in terms of time taken to execute

Result

Supervisor used this insight to redefine the work instructions and fix the sequence of nut running activity at the station, leading to a line level impact on throughput.