Factory Floor

Bottleneck Analysis & Insights


Improved JPH By 20%

Battery Assembly Line

The Challenge

Linecraft-identified top bottleneck's cycle histogram revealed that almost 30% of the cycles are exceeding the designed takt time. Linecraft also showed the reasons causing these cycle to exceed.

30% of the cycles exceeded target resulting in ~5% time loss

Result

By eliminating the top bottleneck flagged by Linecraft, the customer was able to see a sharp increase in the JPH (jobs per hour).